A comprehensive inspection of a building’s engineering infrastructure and architectural and structural elements aimed at identifying hidden defects, assessing operational risks, and verifying compliance with regulatory requirements.
STEP 1
Technical Assignment Stage
-
assistance in drafting the technical assignment for design: conducting a detailed analysis of the project’s requirements and conditions;
-
drafting the technical assignment for design: developing a complete and detailed technical assignment taking into account all specific requirements of the client.
STEP 2
Design Stage
-
analysis of design solutions regarding the building’s engineering systems;
-
preparation of written recommendations upon individual requests;
-
verification of design solutions’ compliance with the current state of the construction and engineering industry;
-
assistance in selecting contractor organisations;
-
recommendations on the selection of materials and main engineering equipment;
-
issuance of relevant comments and recommendations in the form of written reports.
STEP 3
Construction Control / Project Management Stage
-
analysis of technical documentation regarding the building’s engineering systems for compliance with the client’s design assignments, technical conditions, and regulatory documents of the Russian Federation;
-
participation in inspections of the condition and conformity to design of the equipment arriving for installation;
-
quality inspection of installation works;
-
compilation and maintenance of defect statements;
-
monitoring the rectification of deficiencies;
-
participation in conducting intermediate tests;
-
control of the budget and timelines of construction projects.
STEP 4
Operation Stage
-
technical audit (due diligence) of the property;
-
audit of operational costs;
-
audit of the efficiency and quality of comprehensive operation and infrastructure services;
-
recommendations on the allocation of operational costs between owners/tenants of the building;
-
organisation of fit-out and construction and installation works (CIW);
-
recommendations on drafting statements of balance-sheet and operational responsibility;
-
recommendations on the possibility of modernisation and reconstruction of the facility’s engineering systems equipment.
